STULZ Air Technology Systems, Inc.
Denton, TX, USA
Summary: The Manufacturing Process Planner supports the operational Departments through a valid master schedule validating the manufacturing operational sequences. A valid master schedule is one in which priority due dates and capacity need dates equal the required dates. This is accomplished by creating and maintaining accurate operational sequences through router creation and maintenance with router groupings, engineering information, materials, and work centers. Essential Duties and Responsibilities: Use the bill of material item's components and drawings to specify where each operation occurs and the sequence of operations that is necessary to fabricate/manufacture the item. Engineering/Production input when required. Create and maintain routing sequences which define the operations that are required to produce an item and the lead time for an item at each routing activity step. A work center is a specific production area on the shop floor where the routing...